Inspection wells
Drainage inspection well D800 ball
It is used in rainwater systems as a sand collecting well. D560 mm and D400 mm PE plastic pipes can be used for well elevation. The pipe must be welded to the well. If necessary, the well may be cut in half from the center rib and the resulting halves can be used for the bottom and ceiling of the D800 PE pipe. The useful capacity of the well is 275 litres. The maximum installation depth of the well is 2.5 m.
Sewage inspection well D400
It is used as a inspection well in sewerage systems. The D400 mm PE pipe is suitable for the well extension. Pipe socket of the appropriate diameter is used to connect the outgoing pipe to the pipeline. Inlet pipe can be brought into the well directly or at up to 45 degrees. Welding must be used to connect the incoming pipe to the well. The maximum installation depth of the well is 3.2 m.
Inspection well bottom D560
It is used as a inspection well in sewerage systems. The D560 mm PE pipe is suitable for the well extension. Pipe socket of the appropriate diameter is used to connect the outgoing pipe to the pipeline. Inlet pipe can be brought into the well directly or at up to 45 degrees. Welding must be used to connect the incoming pipe to the well.